Menu

Ash House   |   SW6

Project Brief: This project was for the "full works." We built a side and rear extension on the ground floor level, converted the loft, constructed a "half pod" and changed the layout of the first floor. The windows were replaced throughout, every bathroom was remodelled, the heating and plumbing systems were completely replaced, a full rewire was carried out, complete redecoration and the rear garden completely remodelled.

In fact it might be easier to list what we didn't change about the house but the finished product looks amazing.

Completion: October 2015

Designer: Ian Hossack - A3 Associates Ltd